Nova Energy 2020 | All Rights Reserved.Design & Developed by VW Themes
Installation in Trelleborg.
Off-grid system with batteries on the cottage.
Panels connected in 1 line in series.
Installation date: 2021
Maximum Power: 600W
Number of Panels: 3 Monocrystalline 200W panels.
Controller: Epewer
Batteries: 2 x 100Ah
Panel Installation